| capacity requirements planning | 能力需求计划 | |
| current standart cost | 现行标准成本 | |
| cycle counting | 循环盘点 | |
| D字母 | ||
| distributed control system(DCS) | 分布式控制系统 | |
| distributed MRP(DMRP) | 分布式MRP | |
| distribution resource planning(DRP) | 分销资源计划 | |
| distribution requirements planning | 分销需求计划 | |
| demonstrated capacity | 纪实能力 | |
| decision support system | 决策支持系统 | |
| discrete manufacturing | 离散型生产 | |
| dispatch list | 派工单 | |
| days offset | 偏置天数 | |
| dependent demand | 相关需求件 | |
| demand management | 需求管理 | |
| demand time fence(DTF) | 需求时界 | |
| demand cycle | 需求周期 | |
| drop shipment | 直运 | |
| E字母 | ||
| electronic datainterchange(EDI) | 电子数据交换 | |
| ergonomics | 工效学 | |
| economic order quantity(EOQ) | 经济定货量法 | |
| earliest due date | 最早定单完成日期 | |
| engineering change order/notice (ECO) | 设计变更通知 | |
| engineering BOM | 工程物料清单 | |
| engineer-to-order(ETO) | 专项生产 | |
| F字母 | ||
| financial accounting | 财务会计 | |
| financial entity | 财务实体 | |
| fixed period requirements | 定期用量法 | |
| fixed order quantity(FOQ) | 固定批量法 | |
| formal system | 规范化管理系统 | |
| feature | 基本组件 | |
| floor stock,bulk item | 作业现场库存 | |
| firm-planned order | 确定定单 | |
| firm-planned time fence | 确定计划时单 | |
| flexible manufacturing system(FMS) | 柔性制造系统 | |
| feature | 特征件 | |
| forward scheduling | 顺排计划 | |
| favorable variance | 有利差异 | |
| finite capacity scheduling(FCS) | 有限能力计划 | |
| finite forward scheduling | 有限顺排计划 | |
| finite loading | 有限排负荷 | |
| final assembly schedule(FAS) | 总装进度 | |
| G字母 | ||
| group technology(GT) | 成组技术 | |
| gross requirements | 毛需求 | |
| H字母 | ||
| hedge inventory | 囤积库存 | |
| I字母 | ||
| independent demand | 独立需求 | |
| informal system | 非规范化管理 | |
| inventory | 库存 | |
| inventory turnover/turns | 库存(资金)周转次数 | |
| indented BOM | 缩排式物料清单 | |
| input/output control | 投入/产出控制 | |
| item,material,part | 物料 | |
| item master,material master | 物料主文件 | |
| infinite loading | 无限排负荷 | |
| J字母 | ||
| job shop | 机群式布置车间 | |
| Just-in-Time(JIT) | 准时制生产 | |